Friday, May 8, 2009
and then we were done
OK let's be honest there are a couple of little things still outstanding but really....... we are done. We hope to find our pots and pans this weekend so that we can cook our first real meal. We can hardly wait. I will post pictures in the next couple of days so stay tuned.
Please feel free to drop by and check it out. It as an absolute thing of beauty.
Hope to actually see you soon
Margaret and Susan
Friday, April 17, 2009
finally some "Stuff" is DONE
Hey the stove is in!!!!!!!!!!!!!!
So is the fridge and it is even panelled
Friday morning the tile guys came back and sealed the tile and grout in the kitchen and grouted the tile backsplash in the bathroom and with that, their work here is done. The only outstanding item is the sealing of the grout in the steam shower and they don't do that it is a "specialist" that comes in. Apparently it is a particular type of grout sealer that is required because of the steam. The last thing we want is to worry about mold so we are content to wait. That should be next week (fingers crossed). The good news is that one sub-trade is done and we are one step closer to completion.
The plumber is also done (we think). The shower head is installed, the dishwasher is hooked up (can't use it yet as there is no panel on the front so no way of opening the drawers), and the doodads for the steam shower are installed
We really are ready now to have our house back.
More work gets done
Tuesday, April 7, 2009
And then there were doors (at least some)
Monday, April 6, 2009
Tiling
Tuesday, March 31, 2009
Casings
Sunday, March 29, 2009
A taste of how we are living
Saturday, March 28, 2009
floors
Wednesday, March 25, 2009
Tuesday and what's new?
So on to the bathroom... toilet, no toilet, grout, no grout????
OK no grout but yes a toilet still and they have started up the walls in the shower.
The tile detail that runs through the middle looks great. We knew what the plan was but seeing is believing. Even the edge looks great.
Oh my what will we find after work Wednesday? Stay tuned more to follow.
Monday, March 23, 2009
Monday
Well the floor was in and we did have a toilet but sadly no grouting had happened. This means the toilet will have to come back out so that the floor can be grouted. Oh well at least we have a toilet.
After a meeting with one of our contractors I think we have it sorted but we shall see. While I don't think they were any happier than us that nothing happened, they are not the ones living in the middle of it all.
On the plus side the tile looks great. One small problem the floor is NOT level, which is what the waiting was about. The tiles by the heat register will have to come out and be reset in order for the heat register to lay flat and the baseboards to sit on the floor. We have been assured this will be fixed. Fingers crossed.
Ah the trials and tribulations of renovations.
Friday, March 20, 2009
more bad news
Thursday, March 19, 2009
Bathroom issues :)
Wednesday, March 18, 2009
A kitchen sink
It is starting to come together.
Sunday, March 15, 2009
Cabinets
Wednesday, March 11, 2009
Countertops
We chose a granite called Santa Cecilia for the counters,
It is hard to believe that when only a counter changes it makes such a huge difference.
Tuesday, March 10, 2009
Finally... change
Finally
We expect that our new windows (kitchen and outside the bathroom) will go in today.
I spent the weekend staining and varnishing them in anticipation of them being installed, the hold up was the hardware had not yet arrived. We were reluctant, strangely, to install them without the ability to lock them. The hardware has arrived and with any luck when we get home they will be installed. We can't wait.
Today the windows tomorrow maybe the countertops.
Stay tuned
Friday, February 27, 2009
Problems
After the cupboards, membrane and NuHeat 2 and 1/2 weeks ago pretty much nothing has been done. The granite we selected wasn't available at 2 of the places we went to and since we actually do have to work for a living it took a while to get to somewhere we could look at it. We have it now but...
Then we ran into some contractor issues. Not a shock to those of you who have done renos but still disheartening. The painters (you remember them the ones who caused the flood) actually did a really bad job painting and they used semi-gloss everywhere. What were they thinking? In addition they are not planning on coming back until the very end. We all know how tricky it is painting around all the woodwork in our homes and since Susan and I are quite picky about the paint job (since we will be looking at it for a long time) we have decided we will just paint it ourselves. This way it will be done before anything else gets installed and we know it will be done right. Add to that some cost overruns and a couple of surprises regarding decisions they made without talking to us and the last 2 weeks have resulted in not a lot of work done. We think it is all pretty much good now. We will paint this weekend, finish varnishing all the woodwork we have stored in Marni and Meg's garage and the next round will begin. Stay tuned I am sure things will start to happen now.
more catching up
So where were we? Ah the boxes. Yes the bottom boxes are in and then the guys came and installed the membrane in the shower to ensure no leaks, and a lovely orange it is.
Then the NuHeat pad was installed in the floor. We can hardly wait. A shower my head won't stick out of and a warm floor. It is mighty chilly in the basement in the morning when you are wet from the shower.
Monday, February 23, 2009
catching up
Tuesday, February 10, 2009
Boxes
And then there was a flood
Our brand new mattress and box spring that we bought for the downstairs room is soaked, (had to be tossed), the bottom layer of all our boxes and boxes of kitchen stuff, (moved to the basement to allow for the reno), multiple boxes of Christmas ornaments, carpets, general basement stuff and under everything, is soaked. We worked for hours (I think we stopped at 1 am) and sucked up what we could until we could no longer bend over. The ruined stuff went outside, the wet stuff was moved to the top of things to dry out, carpets were cut into pieces to make them light enough to carry outside and fans were turned on in an effort to dry the rest out.
5 days later it is still wet downstairs but it is getting better. Hopefully we won't grow our own crop of fungus in the walls.
We did discover what happened. It seems that when the painters finished up the painting they went out side and used the hose to cleanup the brushes. What they didn't do is turn off the hose at the wall. All they did was release the lever on the hose itself. The pressure built up backwards and where the pipe was weak inside the house, (old plumbing after all), it burst.
Now we need to add "upgrade the plumbing" to the budget.
All we can think is it could have been worse. If this had happened last weekend we would have been away and it would have run the whole time we were away.